Products
Chips today. Modules next. Every line starts from a pump pair.


Nonlinear chips, view 1 of 3: The bare chip from the front corner, with the gold contact pads and the QVersion marking
Nonlinear chips
Bare chips. Your pumps, your optics.
1550 ↔ 775 nm · 930 + 1550 → 2325 nm
SHG and SPDC chip, typical values on representative devices
| Second-harmonic wavelength | 735 to 805 nm |
|---|---|
| Pump power | up to 150 mW |
| Pump insertion loss | 6 to 7 dB |
| Operating temperature | 10 to 50 °C |
| Linewidth and RIN | 4 × pump |
Typical values on a best-effort basis. Sources:
- QVersion datasheet, SHG and SPDC chip, June 2026
- Ahler et al., Opt. Lett. 50, 3652 (2025) doi.org/10.1364/OL.555573
- QVersion product documentation, July 2026

Mid-IR source module, view 1 of 3: The module closed, with the mid-infrared beam out
Mid-IR source module
Two fibers in. One collimated mid-infrared beam out.
1064 + 1550 → 3393 nm
Preliminary specification, first configuration
| Pump inputs | 1064 nm and 1550 nm, fiber-coupled |
|---|---|
| Output | 3393 nm nominal, collimated beam |
| Accessible range | about 3.6 to 3.9 µmdepends on the 1550 nm source |
| Operation | CW at room temperature, no waveguide heating |
| Linewidth | sum of the pump linewidths |
| Warranty | 12 months, limited |
Typical values on a best-effort basis. Sources:
- QVersion product documentation, July 2026

Plug-and-play mid-IR source module, view 1 of 2: Plug-and-play module closed, with the mid-infrared beam leaving the window
End of 202812
Plug-and-play mid-IR source module
One collimated mid-infrared beam out.
Two pump laser dies flip-chip bonded onto the chip.
Custom wavelengths
Not in the list? We design the chip and pick the pump pair. Fixed price, billed per milestone.
1 nm on pump A moves the output 10.2 nm. On pump B 4.8 nm.
Module, first units December 2026.
1/λout = 1/λA − 1/λB. Energy conservation. Efficiency depends on phase matching, set in the waveguide design.
Start with chips. Scale to volume.
Chips for evaluation now. Evaluation modules from December 2026. Custom development with demonstrators in 6 to 9 months. Volume supply after qualification.
Talk to an engineer